© Copyright 2008 The
Entech Group, Inc. – All Rights Reserved.
Use of this website signifies your agreement to the Terms of Use.
For questions or comments, please contact The Entech Group, Inc.
|
|
Environmental Turn Key Site Investigation & Remediation Project Related Experiences |
|||||||
|
|
||||||||
|
|
||||||||
|
Other Professional Environmental Services included the remediation of contaminated areas impacted by site operations, the removal and remediation of one (1) 8,000 gallon Underground Storage Tank (UST), removal and remediation of one (1) hydraulic lift, as well as the excavation, transportation and disposal of approximately 250 tons of non-hazardous contaminated soils, removal transportation and disposal of approximately 3,000 gallons of hazardous liquid, proper disposal of twenty-five (25) 55 gallon drums, cleaning and disposal of sediment from oil-water separators, sumps and inlets, installation of a remedial groundwater treatment system due to localized contaminated groundwater, performance of numerous soil borings and soil sampling activities and performance of preliminary and final groundwater sampling services. The preparation of Preliminary Assessments, Site Investigation, Remedial Investigation and Remedial Action Work Plans and Reports were also completed. The Entech Group, Inc. is the Design-Build, Remediation company for this Project.
|
||||||||