© Copyright 2008 The
Entech Group, Inc. – All Rights Reserved.
Use of this website signifies your agreement to the Terms of Use.
For questions or comments, please contact The Entech Group, Inc.
|
|
General Design, Build, Construction & Construction Management Project Related Experiences |
|
||||||
|
|
||||||||
|
|
||||||||
|
Site Engineering for this phase of the Project include a review of previous reports and studies, as well as the preparation of construction plans and details associated with portions of the wastewater conveyance, treatment and disposal system(s). The typical wastewater system includes: sanitary manholes, sanitary piping network, wastewater pump station consisting of wet wells, chambers, piping appurtenances and electrical components, on - site disposal systems (approximately 7,500 sf to 10,000 sf each). Additional engineering services include the testing of the existing disposal beds to determine functionality. Based on the test results, Entech will prepare and submit documents and materials to the New Jersey Department of Environmental Protection (NJDEP) Division of Water Quality for a Treatment Works Application (TWA). Entech is under contract to perform construction related services to include but not limited to, the installation of a new wastewater pump station, the installation of new on -site sewage disposal bed systems and final restoration activities. Entech has also been retained to investigate additional portions of the wastewater conveyance and treatment and disposal systems. Besides investigating these, Entech has been authorized to prepare a preliminary Water Assessment Study of the existing system, which services the High Point Country Club development. The Entech Group, Inc. is the Prime Contractor for this Project.
|
||||||||
![]()
![]()
![]()