Performed an analysis of the repair and rehabilitation alternatives for the principal spillway
Prepared and submitted a letter to the NJDEP specifying the conceptual repair and rehabilitation alternative selected
Prepared detailed design documents and obtained approval from the NJDEP permitting construction of the proposed dam improvements
Conducted detailed hydrologic and hydraulic modeling for the reduction in design storm criteria and hazard classification
Prepared and submitted an Emergency Action Plan and an Operation and Maintenance Manual
Project Highlights
Entech succeeded in reducing the design storm and dam’s classification from Class II to Class III, resulting in significant financial benefit for the Client.