button1 button2 button3 button4 button5 button6 button7
Business Sectors
Our Clients

Testimonials

Case Studies
Case Study
Don Bosco Technical High School
Paterson, NJ

Entech Services
  • Provided Preliminary Environmental Assessment for 250,000 square foot facility
  • Performed preliminary soil and groundwater sampling
  • Master planning services for: 
    • Preparation of multiple concept plan designs
    • Review of site and land planning issues
    • Preparation of conceptual site plans
    • Confirmation of 100 year flood plain delineated limits
  • Prepared Asbestos Management Plan
  • Assisted with the testing and reporting for three onsite underground storage tanks
    (10,000, 6,000 and 15,000 gallons)
  • Performed Asbestos Abatement and interior building restoration activities
  • Provided Inventory, classified, transported and properly disposed of unknown chemicals
  • Installed gas supply piping system and upgraded and repaired multiple building roofs
  • Assisted client in obtaining financial grants and loans totaling $150,000 from the NJDEP and NJEDA to address closure of the underground storage tank systems
  • Provided construction management services for the new computer facility project
  • Prepared Site Investigation Plan and Site Investigation Report
Project Highlights
  • True turnkey project; all client’s needs performed by Entech
  • Assisted Client in receiving $150,000 in low interest loans

Site Map | © Copyright 2008 The Entech Group, Inc.